Find contracting opportunities that include engineering contracts for design and construction projects, service contracts for transportation studies and media as well as Information Technology (IT) goods and/or services.
Search contracting opportunities
You might be looking for the public works Call for Bids or the advanced schedule of public works contracts
159 results
Bagley Creek Bridge - Bridge Scour
Publication date:
Contract number: XE3576
Submittal due:
Improvement of SR 542 in Whatcom County, MP 49.12 to MP 49.18, Bagley Creek Bridge; Bridge Scour by repairing a scour hole at Br. No. 542/42 with concrete, moving existing streambed rocks to prevent future scour, roadside restoration, temporary erosion and water pollution control, temporary traffic…
2024 Rail, Freight and Ports Division General Engineering Consulting Services
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide 2024 Rail, Freight and Ports Div. General Engineering Consulting Services. One (1) agreement may be…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide 2024 Rail, Freight and Ports Div. General Engineering Consulting Services. One (1) agreement may be…
SR 20 Spur, Shaw Ferry Terminal - Trestle Repair
Publication date:
Contract number: XE3573
Submittal due:
Improvement of Shaw Ferry Terminal in San Juan County to install steel reinforcement, drill micropiles, repair timber piles, remove and dispose of debris, obstructions, and redundant piling, traffic control and other work. Involves 11 items and 100 working days. Work class 6 or 36.
Eastern Region 2025 Bridge Repair
Publication date:
Contract number: XE3574
Submittal due:
Improvement of SR 26 MP 84.14 (Bridge No. 26/135) and 1-90 MP 206.84 (Bridge No. 090/312S) with concrete overlay, scarifying concrete surface, deck repair, planning bituminous surface, removing existing overlay from bridge deck, hot mix asphalt paving, surveying for concrete overlay, steel…
US 395 / NSC 2024 Demo No 2
Publication date:
Contract number: XE3572
Submittal due:
Improvement of WSDOT owned property within the City of Spokane at 1114 N Ralph St, 3129 / 3139 E Trent Ave, 3133 E Trent Ave, 2404 / 2406 E 3rd Ave and 2408 E 3rd Ave by abatement of asbestos materials, removal and disposal of buildings and peripherals, cement and asphalt concrete removal, fence…
2024 WSF Southworth Program General Engineering Consultant
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide General Engineering Services for the SR160/Southworth Terminal – Terminal Building and Trestle…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide General Engineering Services for the SR160/Southworth Terminal – Terminal Building and Trestle…
SR 503/Pedestrian Signal Prairie High School Vicinity
Publication date:
Contract number: XE3569
Submittal due:
Installing a HAWK pedestrian signal, illumination, ITS, ADA curb ramps, monolithic traffic island and traffic curb, pavement markings, permanent signing and other work. Involves 45 items and 30 working days. Work class 41.
SR 171, Moses Lake - RRFB Retrofit to Mast Arm
Publication date:
Contract number: QR4271
Submittal due:
Requires inlet protection, compost sock, high visibility fence, cement concrete traffic curb and gutter, pedestrian curb, plastic stop line, permanent signing, intelligent transportation systems (ITS) - rectagular rapid flashing beacon (RRFB) signals, project temporary traffic control, work zone…
Notice of bid opportunity - Washington State Zero-Emissions Medium & Heavy-Duty Vehicles “MHDV” Incentive Program
Publication date:
Submittal due:
Notice - This ad is currently closed.
As per ESHB 2134, Sec 215 of the 2024 Supplemental Transportation Budget Proviso, WSDOT was tasked with finding a Contractor(s) to develop and administer a one hundred- and ten-million-dollar $110,000,000 point-of-sale voucher incentive program…
As per ESHB 2134, Sec 215 of the 2024 Supplemental Transportation Budget Proviso, WSDOT was tasked with finding a Contractor(s) to develop and administer a one hundred- and ten-million-dollar $110,000,000 point-of-sale voucher incentive program…
Competitive Procurement - Washington Electric Bicycle Rebate Program
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (“WSDOT”) is issuing this Competitive Solicitation pursuant to RCW 39.26. Pursuant to this Competitive Solicitation, WSDOT intends to conduct a competitive procurement to award an Agency Contract…
The Washington State Department of Transportation (“WSDOT”) is issuing this Competitive Solicitation pursuant to RCW 39.26. Pursuant to this Competitive Solicitation, WSDOT intends to conduct a competitive procurement to award an Agency Contract…
2024 WSDOT Capital Facilities General Engineering Contract
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services for the WSDOT Capital Facilities General Engineering Contract. One (1) Task Order Negotiated…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services for the WSDOT Capital Facilities General Engineering Contract. One (1) Task Order Negotiated…
I-90, Schrag WB - Well Nitrate Remediation - ER
Publication date:
Contract number: XE3563
Submittal due:
Decommissioning and replacement of the existing well in a new location, replacement of waterlines (trenching and/or directional drilling may be used; directional drilling only under I-90), asphalt, concrete, water system equipment, electrical and mechanical systems, relocating the existing well…
SR 516 to S 200th Street Paving & ADA Compliance
Publication date:
Contract number: XE3553
Submittal due:
Planing bituminous pavement, paving with hot mix asphalt (HMA), pavement repair, upgrading 35 curb ramps, intelligent transportation systems (ITS) work, pavement marking, installation of precast dual faced sloped mountable curb, traffic control and other work. Involves 87 items and 195 working days…
SR 167, I-5 to SR 161 - New Expressway Project
Publication date:
Contract number: XE3431
Submittal due:
This project proposes to construct the final stage of the SR 167 Completion project from I-5 to SR 161, complete the diverging diamond interchange at I-5 and also at SR 161, builds a new half interchange at Valley Avenue, a large segment of the spuyaləpabš Trail, an auxiliary lane on southbound I-5…
I-90, ER TMC Relocation - Communications Hub
Publication date:
Contract number: XE3560
Submittal due:
Installing precast concrete fiber hub, switch gear racks, uninterruptible power supply (UPS) system, power generator, fiber conduit with innerduct, fiber optic cabling, junction boxes, slab on grade concrete foundation, traffic control and other work. Involves 27 items and 43 working days. Work…
SR 515, Panther Creek Fish Passage Demo 1 (Small Works Roster)
Publication date:
Contract number: 23A825
Submittal due:
Remove fish barrier site 997645 by abatement of asbestos materials, removal and disposal of a two story single family residential building, building building contents, water and sewer service lines and miscellaneous debris. Involves 11 items and 10 Working days. Work class 1 or 13.
US 97 et al, Illumination and Signal Cabinet Update
Publication date:
Contract number: XE3558
Submittal due:
Illumination system, traffic signal system, traffic control and other work. 40 working days. Involves 15 bid items. work class 9 or 16.
SR 522, UNT TO Evans Creek Adaptive Management (Small Works Roster)
Publication date:
Contract number: XE3554
Submittal due:
Installation of 8-point bars, traffic control, erosion control, and other work. 14 Working days. Involves 20 items. Work class 1.
SR 161, Unnamed Trib to South Creek - Remove Fish Barrier
Publication date:
Contract number: XE3555
Submittal due:
Replacing the existing 36-inch and 18-inch diameter concrete culverts with an 18-foot minimum hydraulic opening, contractor designed buried structure. The Work includes a temporary stream diversion system, erosion control, dewatering, clearing grubbing, tree removal, guardrail removal, structure…
SR 18, Issaquah Hobart Rd to Deep Creek Vicinity - Widening & Fiber
Publication date:
Contract number: XE3518
Submittal due:
The Project will widen SR 18 to a four-lane divided highway from just west of the Tiger Mountain Summit near MP 23.04 to Deep Creek at approximately MP 25.68. The project will also construct roundabouts at the SR 18/Issaquah-Hobart Road interchange ramp intersection and provide intelligent…
SR 542, Bagley Creek Bridge - Bridge Scour
Publication date:
Contract number: XE3552
Submittal due:
Repairing a scour hole at BR. No. 542/42 with concrete, moving existing streambed rocks to prevent future scour, roadside restoration, temporary erosion and water pollution control, temporary traffic control and other work. Involves 43 items and 49 working days. Work class 1.
2024 WSDOT Consultant Prequalification
Publication date:
Submittal due:
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be prequalified to provide professional services for WSDOT.
Firms that complete the prequalification process will be eligible to compete for select WSDOT projects for the period…
Firms that complete the prequalification process will be eligible to compete for select WSDOT projects for the period…
2024 WSDOT Space Use Study
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide deliverables as identified in attached scope of work. One (1) agreement may be awarded.
…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide deliverables as identified in attached scope of work. One (1) agreement may be awarded.
…
2024 Geotechnical Engineering & Project Delivery (Area 1)
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide senior level geotechnical engineering related work. One (1) agreement may be awarded. The agreement…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide senior level geotechnical engineering related work. One (1) agreement may be awarded. The agreement…
SR 26 and I-90, Eastern Region 2024 Bridge Repair
Publication date:
Contract number: XE3537
Submittal due:
Constructing modified concrete overlay, scarifying concrete surface, type 2 deck repair, planning bituminous surface, removing existing overlay from bridge deck, HMA paving, surveying for concrete overlay, steel reinforcement bar for deck repair, pavement markings, shoulder rumble strips, erosion…
2024 Geotechnical Engineering & Project Delivery (Area 2)
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide senior level geotechnical engineering related work. One (1) agreement may be awarded. The agreement…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide senior level geotechnical engineering related work. One (1) agreement may be awarded. The agreement…
2024 Air Mobility Aircraft Plan
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide an Air Mobility Aircraft Plan. One (1) agreement may be awarded. The agreement will be approximately…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide an Air Mobility Aircraft Plan. One (1) agreement may be awarded. The agreement will be approximately…
2024 Freight Mobility Strategic Investment Board (FMSIB) Six-Year Plan Preparation
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Freight Mobility Strategic Investment Board (FMSIB) solicits interest from consultants who wish to be evaluated and considered to provide a FMSIB Six-Year Plan Preparation. One (1) agreement may be awarded.
…
The Washington State Freight Mobility Strategic Investment Board (FMSIB) solicits interest from consultants who wish to be evaluated and considered to provide a FMSIB Six-Year Plan Preparation. One (1) agreement may be awarded.
…
2024 ER Transportation Management Center Relocation
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide deliverables as identified in attached scope of work. One (1) agreement may be awarded.
…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide deliverables as identified in attached scope of work. One (1) agreement may be awarded.
…
2024 Community Centered Transportation Leadership to Curb Carbon
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide grant program development and awards in support of Community-Centered Transportation Leadership to…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide grant program development and awards in support of Community-Centered Transportation Leadership to…
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.