SR 525/I-405 I/C to SR 99 Vicinity Paving & ADA Compliance

Publication date:
Contract number: XE3644
Submittal due:
  • Public Works
  • Advertised
  • Snohomish County
Requires planing bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, signal loop replacement, pavement markings, truck apron installation, temporary erosion and water pollution control, traffic control and other work. Involves 56 items and 49 working days. Work class 4, asphalt…

SR 112, E of Sail River to E of E Twin River - Paving Preservation & Emergency

Publication date:
Contract number: XE3645
Submittal due:
  • Public Works
  • Advertised
  • Clallam County
Requires hot mix asphalt (HMA) saw cut and seal, HMA overlay, pre-level, beam guardrail, culvert replacements, shoulder finishing, embankment repair, construction of an access path, rock placement, pavement repair, traffic control and other work. 120 working days. Involves 64 items. Work class 4 -…

I-90, Guardrail Basic Safety - Rehabilitation

Publication date:
Contract number: XE3643
Submittal due:
  • Public Works
  • Advertised
  • Adams County
  • Lincoln County
  • Spokane County
Removing guardrail, anchors, and curbing, constructing guardrail embankment widening and extruded curb, raising and installing guardrail, transitions, terminals, guideposts, traffic control and other work. 50 Working days and 24 items. Work class 11, guardrail.

Notice of bid opportunity - Business Support Services Program

Publication date:
Submittal due:
  • Consultant Services
  • Advertised
  • Statewide
The Washington State Department of Transportation (“WSDOT”) is issuing this Competitive Solicitation pursuant to RCW 39.26. Pursuant to this Competitive Solicitation, WSDOT intends to conduct a competitive procurement to award an Agency Contract for WSDOT to contract with a Business Development…

I-90, BNRR Bridge to Geiger Rd - Paving

Publication date:
Contract number: XE3640
Submittal due:
  • Public Works
  • Advertised
  • Spokane County
Roadway excavation, shoulder finishing, pavement repair, drainage, crack sealing, planing bituminous pavement, hot mix asphalt (HMA) for pre-leveling and pavement repair, HMA paving, erosion control, extruded curb, guardrail, guideposts, pavement markings, signing, rumble strips, structure…

I-90, EB Mercer Slough to 150th Ave SE Paving & Bridge Deck Resurface

Publication date:
Contract number: XE3641
Submittal due:
  • Public Works
  • Advertised
  • King County
Planing bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, bridge expansion joint modification, removing and replacing bridge deck waterproof membrane and HMA overlay, beam guardrail replacement, permanent impact attenuator replacement, pavement marking, temporary erosion and water…

US 2, South Shore Rd to Newport Paving

Publication date:
Contract number: XE3635
Submittal due:
  • Public Works
  • Advertised
  • Pend Oreille County
Requires shoulder finishing, pavement repair excavation, crack sealing, planing bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, erosion control, extruded curb, guardrail, guideposts, pavement markings, rumble strips, permanent signing, traffic control and other work. Involves…

I-82 to Selah Creek - Paving

Publication date:
Contract number: XE3638
Submittal due:
  • Public Works
  • Advertised
  • Yakima County
Requires planing existing roadway and one bridge deck, removing existing overlay, applying bridge deck repair and installing waterproof membrane to two bridge decks, crack sealing, paving with hot mix asphalt, fog sealing, replacing guardrail and nonstandard terminals, replacing centerline rumble…

SR 305, Bainbridge Ferry Terminal - NE Parking Lot Pavement Rehabilitation

Publication date:
Contract number: XE3637
Submittal due:
  • Ferries
  • Public Works
  • Advertised
  • Kitsap County
Requires improvement of parking stalls, Americans with Disabilities (ADA) improvements, pavement excavation, hot mix asphalt (HMA) paving, striping, a new badge in employee gate, traffic control and other work. Involves 37 items and 40 working days. Work class 1 & 4 - clearing, grubbing,…

I-5, 0.1 Miles N of Koontz Rd to SR 507 – Paver

Publication date:
Contract number: XE3636
Submittal due:
  • Public Works
  • Advertised
  • Lewis County
This project will preserve the existing pavement along Northbound and Southbound I-5, MP 69.40 to 80.75 by planing existing asphalt pavement and replacing with hot mix asphalt (HMA). This project will include all through lanes and auxiliary lanes and will also improve the condition of five bridges…

Notice of bid opportunity - LiDAR Processing Software

Publication date:
Submittal due:
  • Administration & Information Technology
  • Advertised
  • Statewide
The Washington State Department of Transportation (“WSDOT”) is issuing this Competitive Solicitation pursuant to RCW 39.26. Pursuant to this Competitive Solicitation, WSDOT intends to conduct a competitive procurement to award an Agency Contract for WSDOT to purchase from a qualified vendor that…

SR 99, Tunnel Pavement Texturing

Publication date:
Contract number: XE3633
Submittal due:
  • Public Works
  • Advertised
  • King County
Requires texturing the existing concrete pavement, including temporary erosion and sediment control, temporary traffic control and other work. Involves 16 items and 23 working days. Work class 21.

US 195, SR 27 to Babbit Rd Paving

Publication date:
Contract number: XE3632
Submittal due:
  • Public Works
  • Advertised
  • Whitman County
Requires shoulder finishing, pavement repair excavation, crack sealing, planing bituminous pavement, pavement repair, hot mix asphalt paving, inlet protection, erosion control, seeding and mulching, medium compost, guardrail, pavement markings, centerline and shoulder rumble strips, signing,…

SR 512 and SR 410, Puyallup and Sumner Vicinity Paving

Publication date:
Contract number: XE3634
Submittal due:
  • Public Works
  • Advertised
  • Pierce County
Milling and filling with hot mix asphalt (HMA), pavement repair and markings, traffic control and other work. 41 working days. Involves 31 items. Work class 4.

I-90, WB SR 900 to E Sunset Way Paving & Expansion Joints

Publication date:
Contract number: XE3627
Submittal due:
  • Public Works
  • Advertised
  • King County
Hot mix asphalt paving and planing, pavement and bridge deck repair, applying waterproof membrane, replacing expansion joints and traffic loops, pavement marking, temporary erosion control, traffic control and other work. Involves 65 items and 86 working days. Work class 4.

US 395, Chewelah to Immel Rd Paving

Publication date:
Contract number: XE3629
Submittal due:
  • Public Works
  • Pending Award
  • Stevens County
Requires planing bituminous pavement, hot mix asphalt (HMA) paving, pavement repair, installing concrete curb, guardrail, guide posts and blocks, crack sealing, HMA joint sealing, shoulder finishing, pavement markings, centerline rumble strips, signing and traffic control and other work. 25 working…

SR 432, Washington Way - Signal Replacement

Publication date:
Contract number: XE3628
Submittal due:
  • Public Works
  • Advertised
  • Cowlitz County
Requires a new traffic signal, illumination, intelligent transportation systems (ITS), traffic islands, ADA curb ramp, APS pushbuttons, paving, pavement markings, permanent signing, traffic control and other work. 45 working days. Involves 44 items. Work class 9.

US 101, Skookum Creek Br to N of Jct SR 8 Paving

Publication date:
Contract number: XE3630
Submittal due:
  • Public Works
  • Advertised
  • Mason County
  • Thurston County
Requires planing bituminous pavement, pavement repair, removal of overlay from bridge deck, bridge deck repair, waterproof membrane, tack coat, inlay with hot mix asphalt (HMA), installing pavement markings installing new signs, maintaining traffic control and other work. Involves 43 items and 57…

Graveyard Spit Dynamic Revetment and Dune Restoration

Publication date:
Contract number: XE3623
Submittal due:
  • Public Works
  • Advertised
  • Pacific County
Requires stabilizing and mitigating erosion of the roadway embankment by constructing a dynamic revetment adjacent to the highway to protect it from wave action, traffic control and other work. Involves 46 items 158 working days. Work class 1.

I-5, SB 100th St SE Vic to Broadway Ave Paving

Publication date:
Contract number: XE3620
Submittal due:
  • Public Works
  • Advertised
  • Snohomish County
Requires planing bituminous pavement, paving with hot mix asphalt (HMA), pavement repair, replacing traffic loops, pavement marking, temporary erosion control, traffic control and other work. Involves 47 items and 60 working days. Work class 4 - asphalt paving.

NB Spokane St Ramp Meter Installation

Publication date:
Contract number: XE3619
Submittal due:
  • Public Works
  • Advertised
  • King County
Requires furnishing and installing ramp meter system, including Non-Intrusive Vehicle Detector for Ramp Metering, ITS, electrical, signing, temporary erosion and water pollution control, traffic control and other work. Involves 17 items and 29 working days. Work class 41 - intelligent…

Kitsap Vicinity - Paving

Publication date:
Contract number: XE3618
Submittal due:
  • Public Works
  • Advertised
  • Kitsap County
  • Pierce County
Requires rehabilitating the existing roadway by planing bituminous pavement, excavating pavement repair areas, paving with hot mix asphalt, bridge deck repair and placing waterproof membrane for bridges, replacing existing pavement markings, traffic control and other work. Involves 47 items and 50…

Eagle Harbor Maintenance Facility Welding Shop Building Replacement

Publication date:
Contract number: XE3625
Submittal due:
  • Ferries
  • Public Works
  • Advertised
  • Kitsap County
Requires constructing a new welding shop, paving, potable water, sanitary sewer, electrical upgrades and other work. Involves 53 items and 235 working days. Work class 7 - building construction.

N of Moclips Highway - Stabilize Slope

Publication date:
Contract number: XE3626
Submittal due:
  • Public Works
  • Advertised
  • Grays Harbor County
Requires repairing an existing hillside due to landslide activity. clearing and grubbing, excavation, installing quarry spalls and ditch liner, constructing horizontal drains, restoration planting, traffic control and other work. Involves 42 items and 55 working days. Work class 1 - clearing,…

Maytown Rd to Plum St - Paving

Publication date:
Contract number: XE3624
Submittal due:
  • Public Works
  • Pending Award
  • Thurston County
Requires milling and filling with HMA, installing a new catch basin, pavement repair, pavement markings, removal of illumination poles and short capping work, traffic control and other work. Involves 48 items and 45 working days. Work class 4 - asphalt paving.

US 395, Hafer Rd to Chewelah - Paving

Publication date:
Contract number: XE3622
Submittal due:
  • Public Works
  • Advertised
  • Stevens County
Requires roadway excavation, embankment compaction, drainage modifications, crack sealing, bridge joint sealing, planing bituminous pavement, hot mix asphalt (HMA) paving, joint adhesive, erosion control, seeding and mulching, compost, curb and gutter, sidewalk, guardrail, pavement markings, rumble…

I-90, EB WLS Parkway to E Sunset Way - Paving

Publication date:
Contract number: XE3621
Submittal due:
  • Public Works
  • Pending Award
  • King County
Requires hot mix asphalt (HMA) paving and planning, pavement repair, replacing traffic loops, pavement marking, temporary erosion and sediment control, temporary traffic control and other work. 52 working days. Involves 37 items. Work class 4 - asphalt paving.

I-90, Harvard Rd Interchange Ramp Meters

Publication date:
Contract number: XE3617
Submittal due:
  • Public Works
  • Advertised
  • Spokane County
Planing bituminous pavement, installing maintenance access pads, hot mix asphalt (HMA) paving, guardrail, pavement markings, permanent signing, illumination, traffic signal and ITS systems, directional boring, traffic control and other work. 40 working days. Involves 28 items. Work class 9 & 16…

US 2, West of Leavenworth - Slope Stabilization

Publication date:
Contract number: XE3616
Submittal due:
  • Public Works
  • Pending Award
  • Chelan County
  • King County
Requires rock slope scaling, pavement and guardrail repair, slope protection, traffic control and other work. Involves 31 items and 36 working days. Work class 39.

Systemwide On-Call Off-Shore Maintenance

Publication date:
Contract number: XE3615
Submittal due:
  • Ferries
  • Public Works
  • Pending Award
  • Jefferson County
  • Island County
  • King County
  • Kitsap County
  • San Juan County
  • Skagit County
  • Snohomish County
  • Pierce County
Requires improvement of damaged wingwalls and dolphin structures, counterweight cables, anchor chain, anchors, piles, and live load hanger bar replacement at Washington State Ferry Terminals in various Counties on an on-call basis, and other work. The duration of this Contract is from the date of…

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.