Bid opening results
Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.
Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.
If a change has been made to a contractors bid amount or bid position after review, it will be marked with two asterisks.**
- Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
- Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.
5/7/2025 bid opening - Olympia, WA
Item no. 1: US 2, West of Leavenworth - Slope Stabilization
Contract number: XE3616
Engineer's estimate: $1,116,522.79
Number of addenda: 1
Number of bidders: 6/3
Award status: pending
Preliminary bid total results
Apparent low: Access Limited Construction - $980,460.92
Apparent second: KRCI LLC - $1,170,604.00
Apparent third: Rock Supremacy LLC - $1,253,777.00
Verified bid total results
Low bidder: Access Limited Construction
Bid amount: $980,460.92
Subcontractor named
- North Star Enterprises 1, Inc
Description of work: project traffic control items 10, 13, 14 and 16 - Petersen Brothers Inc.
Description of work: temp, barrier, temp impact attenuator, FA guardrail repair items 8, 9, 19 - Specilaized Pavement Markings
Description of work: Paint Line, TPM Short Duration items 11, 12 - Central Washington Asphalt
Description of work: FA Pavement Repair item 5
Disadvantaged business enterprise (DBE)
- North Star Enterprises - sub (force account) - $2,500.00
Description of work: repair transportable attenuator (7450) - North Star Enterprises - sub - $16,000.00
Description of work: portable changeable message sign (6993) - North Star Enterprises - sub - $150,000.00
Description of work: project temporary traffic control (6971) - North Star Enterprises - sub - $22,200.00
Description of work: construction signs class A (6982)
DBE goal: $127,459.92
DBE total: $190,700.00
Second bidder: KRCI LLC
Bid amount: $1,170,604.00
Subcontractor named
- Apex Rockfall Mitigation LLC
Description of work: rock slope scaling, type A post anchorage, type C post anchorage, type 2 SPS repair USMS #29, type 2 SPS B rope replacement, type 1 SPS Repair Type 2 SPS Repair USMS #38, Rock Dowel Type 1 Reinforcement
Disadvantaged business enterprise (DBE)
- TBMM LLC - sub - $128,311.00
Description of work: temporary traffic control, temporary striping - M2 Industrial Inc. - sub - $43,687.50
Description of work: temporary barrier, temporary impact attenuator
DBE goal: $152,178.52
DBE total: $171,998.50
Third bidder: Rock Supremacy LLC
Bid amount: $1,253,777.00
Subcontractor named
- None proposed
Description of work: none proposed
Disadvantaged business enterprise (DBE)
- Caliber Traffic Solutions, LLC. - sub - $166,350.00
Description of work: traffic control, temporary control devices
DBE goal: $162,991.01
DBE total: $166,350.00
Item no. 2: Systemwide On-Call Off-Shore Maintenance
Contract number: XE3615
Engineer's estimate: $1,397,924.00
Number of addenda: 2
Number of bidders: 2/2
Award status: pending
Preliminary bid total results
Apparent low: American Construction Co., Inc. - $1,844,104.00**
Apparent second: Manson Construction Co. - $1,972,604.00
Verified bid total results
Low bidder: American Construction Co., Inc.
Bid amount: $1,844,104.00**
Subcontractor named
- Self-perform
Description of work: structural steel installation
Public works small business enterprise (PWSBE)
- City Fab Inc. - sub - $361,589.00
Description of work: misc. steel, steel fab. - Crux Diving - sub - $3,148.00
Description of work: dive support, diving
PWSBE goal: $92,205.20
PWSBE total: $364,737.00
Veteran-owned business (VOB)
- Lee Composites, Inc. - sub - $61,114.00
Description of work: VNMV fab.
VOB goal: $36,882.08
VOB total: $61,114.00
Second bidder: Manson Construction Co.
Bid amount: $1,972,604.00
Subcontractor named
- Manson Construction Co.
Description of work: structural steel installation
Public works small business enterprise (PWSBE)
- Jabez Holdings, Inc. DBA ST Fabrication Inc. - manufacturer/supplier - $99,680.00
Description of work: fabricate miscellaneous metals
PWSBE goal: $98,630.20
PWSBE total: $99,680.00
Veteran-owned business (VOB)
- Matheus Lumber Co., Inc. - manufacturer/supplier - $70,560.00
Description of work: furnish rub timbers
VOB goal: $39,452.08
VOB total: $70,560.00
Item no. 3: I-90, EB WLS Parkway to E Sunset Way - Paving
Contract number: XE3621
Engineer's estimate: $4,642,603.60
Number of addenda: 0
Number of bidders: 3/3
Award status: pending
Preliminary bid total results
Apparent low: CPM Development Corporation - $4,217,676.25
Apparent second: Lakeside Industries, Inc. - $4,787,372.30
Apparent third: Granite Construction Company - $5,816,611.60
Verified bid total results
Low bidder: CPM Development Corporation
Bid amount: $4,217,676.25
Subcontractor named
- G & G Inc.
Description of work: ITS replacing induction loops
Disadvantaged business enterprise (DBE)
- G & G Inc. - sub - $75,000.00
Description of work: electrical - O'Bunco Engineering - sub - $21,885.00
Description of work: surveying - A & H RoadWurx - sub - $142,000.00
Description of work: milling - BC Traffic - sub - $563,000.00
Description of work: traffic control
DBE goal: $801,358.49
DBE total: $801,885.00
Second bidder: Lakeside Industries, Inc.
Bid amount: $4,787,372.30
Subcontractor named
- G & G Inc.
Description of work: all electrical including item 24 ITS replacing induction loops
Disadvantaged business enterprise (DBE)
- Novito Construction, Inc. - sub - $770,000.00
Description of work: project temporary traffic control - G & G Inc. - sub - $75,000.00
Description of work: electrical - ITS replacement loops - O'Bunco Engineering - sub - $54,110.00
Description of work: surveying - The Bag Lady - sub - $10,660.00
Description of work: inlet protection
DBE goal: $909,600.74
DBE total: $909,770.00
Third bidder: Granite Construction Company
Bid amount: $5,816,611.60
Subcontractor named
- G & G Incorporated
Description of work: electrical
Disadvantaged business enterprise (DBE)
- BC Traffic LLC - sub - $645,000.00
Description of work: traffic control (partial) - A & H RoadWurx - sub - $170,000.00
Description of work: asphalt milling - G & G Incorporated - sub - $75,000.00
Description of work: electrical, loops - O'Bunco Engineering Inc - sub - $21,855.00
Description of work: surveying - Tunista Construction, LLC - sub - $200,000.00
Description of work: dump trucking/haul
DBE goal: $1,105,156.20
DBE total: $1,111,855.00
Item no. 4: US 12, Howell Grade Rd to Garfield-Asotin Co. Line-Paving
Contract number: XE3608
Engineer's estimate: $3,625,763.00
Number of addenda: 4
Number of bidders: 4/2
Award status: pending
Preliminary bid total results
Apparent low: Knife River Corporation Mountain West - $2,939,000.00
Apparent second: Poe Asphalt, Inc. - $3,484,619.73
Verified bid total results
Low bidder: Knife River Corporation Mountain West
Bid amount: $2,939,000.00
Subcontractor named
- None proposed
Description of work: none proposed
Public works small business enterprise (PWSBE)
- Trafficorp - sub - $150,000.00
Description of work: traffic control
PWSBE goal: $146,950.00
PWSBE total: $150,000.00
Veteran-owned business (VOB)
- Columbia Basin Striping - sub - $81,383.00
Description of work: striping/mailboxes/guideposts
VOB goal: $58,780.00
VOB total: $81,383.00
Second bidder: Poe Asphalt Paving, Inc.
Bid amount: $3,484,619.73
Subcontractor named
- None proposed
Description of work: none proposed
Public works small business enterprise (PWSBE)
- North Star Enterprises 1 - sub - $3,058.00
Description of work: centerline rumble strip - North Star Enterprises 1 - sub - $6,116.00
Description of work: shoulder rumble strip - North Star Enterprises 1 - sub - $4,750.00
Description of work: recessed pavement marker - North Star Enterprises 1 - sub - $171,076.00
Description of work: project temporary traffic control
PWSBE goal: $174,230.99
PWSBE total: $185,000.00
Veteran-owned business (VOB)
- Wm. Winkler Company - sub - $73,600.00
Description of work: FDR (partial) - grading
VOB goal: $69,692.39
VOB total: $73,600.00
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.