Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractors bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.

5/7/2025 bid opening - Olympia, WA

Item no. 1: US 2, West of Leavenworth - Slope Stabilization

Contract number: XE3616
Engineer's estimate: $1,116,522.79
Number of addenda: 1
Number of bidders: 6/3
Award status: pending

Preliminary bid total results

Apparent low: Access Limited Construction - $980,460.92
Apparent second: KRCI LLC - $1,170,604.00
Apparent third: Rock Supremacy LLC - $1,253,777.00

Verified bid total results

Low bidder: Access Limited Construction
Bid amount: $980,460.92

Subcontractor named

  1. North Star Enterprises 1, Inc
    Description of work: project traffic control items 10, 13, 14 and 16
  2. Petersen Brothers Inc.
    Description of work: temp, barrier, temp impact attenuator, FA guardrail repair items 8, 9, 19
  3. Specilaized Pavement Markings
    Description of work: Paint Line, TPM Short Duration items 11, 12
  4. Central Washington Asphalt
    Description of work: FA Pavement Repair item 5

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises - sub (force account) - $2,500.00
    Description of work: repair transportable attenuator (7450)
  2. North Star Enterprises - sub - $16,000.00
    Description of work: portable changeable message sign (6993)
  3. North Star Enterprises - sub - $150,000.00
    Description of work: project temporary traffic control (6971)
  4. North Star Enterprises - sub - $22,200.00
    Description of work: construction signs class A (6982)

DBE goal: $127,459.92
DBE total: $190,700.00

Second bidder: KRCI LLC
Bid amount: $1,170,604.00

Subcontractor named

  1. Apex Rockfall Mitigation LLC
    Description of work: rock slope scaling, type A post anchorage, type C post anchorage, type 2 SPS repair USMS #29, type 2 SPS B rope replacement, type 1 SPS Repair Type 2 SPS Repair USMS #38, Rock Dowel Type 1 Reinforcement

Disadvantaged business enterprise (DBE) 

  1. TBMM LLC - sub - $128,311.00
    Description of work: temporary traffic control, temporary striping
  2. M2 Industrial Inc. - sub - $43,687.50
    Description of work: temporary barrier, temporary impact attenuator

DBE goal: $152,178.52
DBE total: $171,998.50

Third bidder: Rock Supremacy LLC
Bid amount: $1,253,777.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Caliber Traffic Solutions, LLC. - sub - $166,350.00
    Description of work: traffic control, temporary control devices

DBE goal: $162,991.01
DBE total: $166,350.00

Item no. 2: Systemwide On-Call Off-Shore Maintenance

Contract number: XE3615
Engineer's estimate: $1,397,924.00
Number of addenda: 2
Number of bidders: 2/2
Award status: pending

Preliminary bid total results

Apparent low: American Construction Co., Inc. - $1,844,104.00**
Apparent second: Manson Construction Co. - $1,972,604.00

Verified bid total results

Low bidder: American Construction Co., Inc.
Bid amount: $1,844,104.00**

Subcontractor named

  1. Self-perform
    Description of work: structural steel installation

Public works small business enterprise (PWSBE)

  1. City Fab Inc. - sub - $361,589.00
    Description of work: misc. steel, steel fab.
  2. Crux Diving - sub - $3,148.00
    Description of work: dive support, diving

PWSBE goal: $92,205.20
PWSBE total: $364,737.00

Veteran-owned business (VOB)

  1. Lee Composites, Inc. - sub - $61,114.00
    Description of work: VNMV fab.

VOB goal: $36,882.08
VOB total: $61,114.00

Second bidder: Manson Construction Co.
Bid amount: $1,972,604.00

Subcontractor named

  1. Manson Construction Co.
    Description of work: structural steel installation

Public works small business enterprise (PWSBE)

  1. Jabez Holdings, Inc. DBA ST Fabrication Inc. - manufacturer/supplier - $99,680.00
    Description of work: fabricate miscellaneous metals

PWSBE goal: $98,630.20
PWSBE total: $99,680.00

Veteran-owned business (VOB)

  1. Matheus Lumber Co., Inc. - manufacturer/supplier - $70,560.00
    Description of work: furnish rub timbers

VOB goal: $39,452.08
VOB total: $70,560.00

Item no. 3: I-90, EB WLS Parkway to E Sunset Way - Paving

Contract number: XE3621
Engineer's estimate: $4,642,603.60
Number of addenda: 0
Number of bidders: 3/3
Award status: pending

Preliminary bid total results

Apparent low: CPM Development Corporation - $4,217,676.25
Apparent second: Lakeside Industries, Inc. - $4,787,372.30
Apparent third: Granite Construction Company - $5,816,611.60

Verified bid total results

Low bidder: CPM Development Corporation 
Bid amount: $4,217,676.25

Subcontractor named

  1. G & G Inc.
    Description of work: ITS replacing induction loops

Disadvantaged business enterprise (DBE) 

  1. G & G Inc. - sub - $75,000.00
    Description of work: electrical
  2. O'Bunco Engineering - sub - $21,885.00
    Description of work: surveying
  3. A & H RoadWurx - sub - $142,000.00
    Description of work: milling
  4. BC Traffic - sub - $563,000.00
    Description of work: traffic control

DBE goal: $801,358.49
DBE total: $801,885.00

Second bidder: Lakeside Industries, Inc.
Bid amount: $4,787,372.30

Subcontractor named

  1. G & G Inc.
    Description of work: all electrical including item 24 ITS replacing induction loops

Disadvantaged business enterprise (DBE) 

  1. Novito Construction, Inc. - sub - $770,000.00
    Description of work: project temporary traffic control
  2. G & G Inc. - sub - $75,000.00
    Description of work: electrical - ITS replacement loops
  3. O'Bunco Engineering - sub - $54,110.00
    Description of work: surveying
  4. The Bag Lady - sub - $10,660.00
    Description of work: inlet protection

DBE goal: $909,600.74
DBE total: $909,770.00

Third bidder: Granite Construction Company
Bid amount: $5,816,611.60

Subcontractor named

  1. G & G Incorporated
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. BC Traffic LLC - sub - $645,000.00
    Description of work: traffic control (partial)
  2. A & H RoadWurx - sub - $170,000.00
    Description of work: asphalt milling
  3. G & G Incorporated - sub - $75,000.00
    Description of work: electrical, loops
  4. O'Bunco Engineering Inc - sub - $21,855.00
    Description of work: surveying
  5. Tunista Construction, LLC - sub - $200,000.00
    Description of work: dump trucking/haul

DBE goal: $1,105,156.20
DBE total: $1,111,855.00

Item no. 4: US 12, Howell Grade Rd to Garfield-Asotin Co. Line-Paving

Contract number: XE3608
Engineer's estimate: $3,625,763.00
Number of addenda: 4
Number of bidders: 4/2
Award status: pending

Preliminary bid total results

Apparent low: Knife River Corporation Mountain West - $2,939,000.00
Apparent second: Poe Asphalt, Inc. - $3,484,619.73

Verified bid total results

Low bidder: Knife River Corporation Mountain West
Bid amount: $2,939,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Public works small business enterprise (PWSBE)

  1. Trafficorp - sub - $150,000.00
    Description of work: traffic control

PWSBE goal: $146,950.00
PWSBE total: $150,000.00

Veteran-owned business (VOB)

  1. Columbia Basin Striping - sub - $81,383.00
    Description of work: striping/mailboxes/guideposts

VOB goal: $58,780.00
VOB total: $81,383.00

Second bidder: Poe Asphalt Paving, Inc.
Bid amount: $3,484,619.73

Subcontractor named

  1. None proposed
    Description of work: none proposed

Public works small business enterprise (PWSBE)

  1. North Star Enterprises 1 - sub - $3,058.00
    Description of work: centerline rumble strip
  2. North Star Enterprises 1 - sub - $6,116.00
    Description of work: shoulder rumble strip
  3. North Star Enterprises 1 - sub - $4,750.00
    Description of work: recessed pavement marker
  4. North Star Enterprises 1 - sub - $171,076.00
    Description of work: project temporary traffic control

PWSBE goal: $174,230.99
PWSBE total: $185,000.00

Veteran-owned business (VOB)

  1. Wm. Winkler Company - sub - $73,600.00
    Description of work: FDR (partial) - grading

VOB goal: $69,692.39
VOB total: $73,600.00

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.